Solutions

Power Distribution Equipment Tester

Concept Introduction

  • Technological requirements of new energy connectors and power distributors are more and more standardized as the new energy automobile develops.
  • Testing to power distributors mainly include: parts assembly, screw assembly, CCD test, HV test, air tightness test, and impedance test etc.

Features and Advantages

  • Use Atlas twist screw extruder, software interface guides operators to assemble screw position, screw position is monitored during entire process.
  • Flexible production line, compatible to assembly of similar products. It allows to produce different product via selecting different technologies and parameters by turning on & off of the equipment.
  • Producing and testing data of the entire production line can be queryed and traced while the entire line can be skip-stop checked.

Technical Parameters:

  • Technical parameters and Ref equipment dimension: 20m*1.5m*1.95m
  • Circulation time:160s/pc
  • OEE: ≥90%
Power Distribution Equipment Tester